Pharmaceutical Industry

Warehouses, steel structures, fuel storage and prefabricated buildings for pharmaceutical facilities in Pakistan, delivered by Apex Engineers.

Pharmaceutical industry

Buildings and Utility Fabrication for Pharmaceutical Facilities

Pharmaceutical manufacturers need clean, well organised facilities and reliable utilities. Hygiene and material requirements are strict, so every supplier must understand what falls inside and outside their scope.

Apex Engineers supports pharmaceutical projects with steel buildings, warehouses, utility area structures, fuel storage for standby power and prefabricated buildings.

Prefabricated modular building with glazing
Typical requirements

What pharmaceutical projects need

Our scope on pharmaceutical projects typically covers non product contact work, such as:

  • Warehouses and utility buildings
  • Steel structures and platforms
  • Fuel storage for standby generators
  • Prefabricated offices and stores
  • Utility piping outside clean areas
  • Site lighting
Working with us

How we approach your project

Product contact equipment in pharmaceutical plants requires specialist stainless steel fabrication and validation, which we do not claim to provide. We focus on the buildings, structures, storage and utilities around the clean areas, and we coordinate with the specialist suppliers working inside them.

  1. Step 1

    Enquiry and engineering review

    We study your drawings, specifications or site details and confirm scope, quantities and the standards that apply.

  2. Step 2

    Design and approvals

    We prepare or review shop drawings and submit them for your approval before any material is cut.

  3. Step 3

    Planning and materials

    Materials are sourced to the specified grades and fabrication is scheduled around your site programme.

  4. Step 4

    Fabrication in our manufacturing facility

    Cutting, rolling, welding, FRP moulding, blast cleaning and coating happen under one roof on Multan Road, Lahore.

  5. Step 5

    Inspection and testing

    Dimensional, weld and coating checks and pressure tests are recorded, and you are welcome to inspect before dispatch.

  6. Step 6

    Installation and handover

    Our own crews install on site with safe working practices, then hand over records and support you in operation.

Planning a project in the pharmaceutical sector?

Share your drawings, specifications or a short description of the scope and our engineers will respond.